general debris
15 Yard Dumpster
11.5'L × 8'W × 5'H
Best for: Medium cleanouts, Small bath remodels, Yard waste.
Review 15 Yard Dumpster →The general-debris lineup starts at $535. Compare size, included weight and days, material rules, placement, and pickup before a low headline rate becomes the wrong job.
Direct answer
The published general-debris lineup starts at $535 for the 15 yard dumpster. That number is useful only when the material, volume, weight, included rental window, address, placement, and pickup plan match the project.
Under-sizing, mixing dense material, exceeding included weight, extending the rental, or creating a failed placement can make a low headline price more expensive.

Published planning baseline
Published rates make the first comparison visible. The address, material, access, permit needs, weight, timing, and pickup plan still belong in the written project quote.
general debris
11.5'L × 8'W × 5'H
Best for: Medium cleanouts, Small bath remodels, Yard waste.
Review 15 Yard Dumpster →general debris
11'L × 8'W × 6'H
Best for: Construction debris, Roofing tear-offs, Larger cleanouts.
Review 20 Yard Dumpster →general debris
18'L × 8'W × 6.5'H
Best for: Large remodels, Whole-home cleanouts, Commercial jobs.
Review 30 Yard Dumpster →general debris
18'L × 8'W × 7.5'H
Best for: Major construction, Large demolition, Industrial cleanouts.
Review 40 Yard Dumpster →concrete, dirt, asphalt
18'L × 8'W × 2'H
Best for: Heavy materials only, Driveway tear-outs, Excavation & ADU dirt.
Review 10 Yard Lowboy →Cost-control gate
01
A lower-rate bin can cost more if the project needs a second haul, swap, rushed load, or overweight container.
02
Roofing, drywall, cabinets, flooring, and wet debris can use the included allowance before the container looks full.
03
Concrete, dirt, asphalt, brick, stone, and tile cannot use the same plan as household and remodel debris.
04
There is no published extension-day fee. Requested extra time is quote-dependent and must be confirmed in writing before the included rental window ends.
05
A tight gate, steep slope, soft surface, overhead obstruction, alley, street placement, or permit question needs review before routing.
06
A headline rate is not a complete comparison unless the address, material, weight, days, access, and pickup plan match.

Project-fit budget
The entry size is not automatically the lowest-total option. Match volume and weight before comparing rates.
Light cleanout
Garage clutter, boxed household items, light yard material, and a small bath project can fit the entry general-debris option when volume and weight stay inside its scope.
Remodel or roofing
The 20 yard starts higher but includes two tons. That extra weight and capacity can be the lower-total choice for roofing, cabinets, drywall, and larger cleanouts.
High-volume project
Whole-home, contractor, commercial, and demolition volume may justify a larger container to avoid a swap or second haul.
Placement preparation
Private-property placement is usually simpler. Share a clear photo of the intended spot and access path. A street, sidewalk, alley, or public right-of-way placement may require local permission.


Loading discipline
Load evenly and below the top rim. Keep restricted material out, keep clean heavy material in its own lane, and leave the pickup path open. A safe, correctly sorted load protects the schedule and the cost assumptions used in the quote.
If the debris changes after booking, contact Haul'n Off before loading it. Material changes can affect the container, disposal lane, weight plan, and pickup.
Separate heavy-material lane
Clean concrete, dirt, asphalt, brick, stone, and tile use the 10 yard lowboy. Its published starting rate is $746 with five included days. Identify the exact material and keep it separate before delivery.
Review the lowboy →
Quote preparation
A budget-first quote needs the job, address, material, placement, and timing—not just a requested yard size.
Open the quote page →Use the right price page
This page
Start with the $535 general-debris baseline, then prevent size, weight, material, time, and access from breaking the budget.
Planning guide
Use broader right-sizing, project fit, placement, and timing guidance when you are still defining the job.
Comparison guide
Normalize two written quotes against the same size, weight, days, material, access, overage, and pickup terms.
Continue planning
Compare every published starting price, included weight, and quote-dependent extra-time terms.
Open guide →Compare every container, dimension, published rate, included weight, rental window, and material lane.
Open guide →Calculate cubic yards and nominal lowboy loads before comparing clean heavy-material project costs.
Open guide →Review the five published starting rates, included weight and days, and final-quote conditions.
Open guide →Review the complete service path for sizing, placement, loading, timing, and pickup.
Open guide →Plan the included window and any approved extension around a defined project schedule.
Open guide →Use the 10 yard lowboy lane for clean concrete, dirt, asphalt, brick, stone, and tile.
Open guide →Check the local routing context and send the exact service ZIP with the quote request.
Open guide →Call, email, or share the project details when you need help before submitting the quote form.
Open guide →Clear answers
No. This page does not publish a lowest-price guarantee or price-match promise. It publishes current starting rates and explains the job details that can change the final project quote.
The 15 yard general-debris dumpster has the entry published starting price at $535 with one ton and one day included. It is not an all-in total. A 3% processing fee applies to all card payments and is separate from the starting price. The final written quote depends on the address, material, access, weight, rental time, permit needs, and applicable conditions.
It can when the project needs the extra volume or included weight. The 20 yard starts at $650 with two tons and one day included. A 15 yard starts lower, but under-sizing can create a second haul, swap, or overweight load.
Send the delivery address and ZIP, debris type, estimated amount and weight, preferred date, rental window, intended placement, and access notes. Photos of the debris and placement area help when a gate, slope, surface, tree, wire, alley, or tight turn may affect delivery.
The final quote can change because of container size, material type, weight above the included allowance, requested extra time, permit needs, route or access conditions, and special handling. General-debris weight above the included allowance is $165 per ton. Requested extra time is quote-dependent and must be confirmed in writing. A 3% processing fee applies separately to all card payments.
General-debris weight above the included allowance is $165 per ton. There is no published extension-day fee. Requested extra time is quote-dependent, is not automatic, and must be confirmed in writing before the included rental window ends.
No. Clean concrete, dirt, asphalt, brick, stone, and tile use the 10 yard lowboy lane, which has a published $746 starting price and five included days. Heavy material must be identified and kept separate before delivery. A 3% processing fee applies separately to all card payments.
A private-property placement is usually simpler. A street, sidewalk, alley, or other public right-of-way placement may require local permission or a right-of-way permit. Confirm the placement and local requirement before delivery rather than assuming a permit is or is not needed.
Project-specific price
Share the address, debris, volume, weight, placement, dates, and access. Haul'n Off can then match the container and confirm availability and project terms.