Skip to content
⚡ Ask About Delivery Timing📞 (619) 720-4511
Haul'n Off Dumpster Rentals
Free Quote
📞 Call Now: (619) 720-4511

San Diego County · Starting prices and cost guides

Dumpster rental pricing in San Diego, all in one place.

Start with the five dumpster prices, see the included weight and rental time, then open the calculator or guide that answers your question.

General-debris dumpster starting totals range from $560 to $975. The clean heavy-material lowboy starts at $771.

$560 to $975
General-debris starting totals
$771
Clean-material lowboy total
3%
All card payments
$75
Per approved appliance

Direct answer

A starting price is the first number, not your final quote.

We list the dumpster, starting price, included general-debris weight, and included rental time. Your written quote confirms the delivery address, material, set-down spot, truck access, schedule, processing, and other terms.

Current starting prices

Starting prices at a glance

Compare the starting price, accepted material, included weight, and included days here. Open the size page for dimensions and help choosing a dumpster, or use the calculator to estimate with the details you know.

Red roll-off dumpsters in multiple sizes for comparing San Diego container starting rates
Different volumes need different container and weight plans.
ContainerMaterialStartingIncluded weightIncluded time
15 Yard DumpsterAccepted general debris$5601 ton included1 day includedDetails →
20 Yard DumpsterAccepted general debris$6752 tons included1 day includedDetails →
30 Yard DumpsterAccepted general debris$9003 tons included7 days includedDetails →
40 Yard DumpsterAccepted general debris$9753 tons included7 days includedDetails →
10 Yard LowboyClean heavy material$771Clean heavy material only5 days includedDetails →

General-debris overage is $165 per ton above included weight. A 3% processing fee applies to all card payments, separate from the starting prices. Approved appliances cost $75 each and require approval before loading. The price list does not set an extra-day fee. We’ll confirm any extra time in writing.

Price conditions

Two details can change the budget before the container looks full.

Red roll-off dumpster with dense remodel debris distributed below the top rim for weight planning

Weight and material

Included tons are not the container's visual fill line.

A dense load can reach its included allowance before the dumpster looks full. Name every material and estimate likely weight before comparing only the headline price.

Red roll-off dumpster on driveway protection with a clear access path and overhead clearance

Placement and access

Truck access and the set-down spot belong in your quote.

Private property is usually simpler than a street or public right-of-way. Share gate, slope, surface, wire, tree, turn, HOA, parking, and permit details before we schedule delivery.

Pricing hub

Choose the pricing answer you need

Each detailed guide answers one pricing question. Start here, then open the guide that matches your question instead of mixing details from different jobs.

Container or labor?

Choose a dumpster or loading help before you compare prices

Dumpster starting prices do not set a universal price for loading help. Choose dumpster rental or loading help before comparing numbers.

Red roll-off dumpster beside staged boxes, boards, cabinet panels, and bagged debris for volume planning

Dumpster starting prices

General-debris roll-off rental

Self-loaded accepted general debris uses the 15, 20, 30, or 40 yard lineup. Select by volume, likely weight, included time, placement, and pickup plan.

Compare general-debris sizes →
Low-profile red dumpster containing a shallow load of clean broken concrete

Concrete and dirt dumpster

Clean heavy-material lowboy

Keep concrete, dirt, asphalt, brick, stone, and tile out of general-debris containers. Tell us the exact material before booking; an approved clean load may use the 10 yard lowboy, and the written quote controls what is approved.

Open concrete and dirt guide →
Red roll-off dumpster with a shallow accepted-material load, staged debris, and a clear pickup path

Loading-help quote

Loading help and cleanup service

Junk removal, debris removal, and construction cleanup are quoted from volume, items, labor, access, handling, timing, and disposal requirements.

Compare service options →

Details for your quote

Send the details that control the written quote

The starting price is only the first number. These details help us check the material, size, truck access, set-down spot, and schedule.

  • Delivery address, city, and ZIP
  • Project type and preferred delivery date
  • Every material planned for the load
  • Estimated debris volume and likely weight
  • Preferred size or a request for sizing help
  • Needed rental window and pickup deadline
  • Photos of the debris and placement area
  • Gate, slope, surface, tree, wire, or tight-turn notes
  • Street, permit, HOA, parking, tenant, or business-hour constraints
Red roll-off dumpster with a shallow accepted-material load, staged debris, and a clear pickup path
Photos of the material and set-down area help us prepare an accurate quote.

Pricing questions

Dumpster rental pricing FAQ

What are Haul'n Off's dumpster rental starting prices?

Haul'n Off's starting prices are $560 for a 15 yard dumpster, $675 for a 20 yard dumpster, $900 for a 30 yard dumpster, $975 for a 40 yard dumpster, and $771 for the 10 yard lowboy. Your written quote confirms the delivery address, material, set-down spot, truck access, schedule, processing, and other terms. A separate 3% processing fee applies to all card payments. Approved appliances cost $75 each and require approval before loading.

What does each starting price include?

The 15 yard general-debris dumpster includes 1 ton and 1 day, the 20 yard includes 2 tons and 1 day, and the 30 and 40 yard dumpsters include 3 tons and 7 days. The 10 yard lowboy includes 5 days for a reviewed clean heavy-material load. Tell us the exact material; the written quote controls what is approved and confirms delivery, pickup, access, and final terms.

Are the dumpster starting prices final totals?

No. They are starting prices and do not include the card fee. General-debris weight above the included allowance is $165 per ton. A separate 3% processing fee applies to all card payments, and approved appliances cost $75 each. The price list does not set an extra-day fee. We’ll confirm any extra time in writing. The delivery address, material, set-down spot, truck access, permit needs, schedule, and other job details can affect your written quote.

Which pricing page should I use?

Use the dumpster rental cost page to calculate with the details you know, the cost-of-a-dumpster guide for the cost equation, the best-price guide to compare written quotes, the cheap-dumpster guide for the lowest general-debris starting price, the affordable guide to control costs, and the temporary-rental guide to plan included time and extra days.

How are overweight loads and extra rental days handled?

General-debris weight above the included allowance is $165 per ton. The price list does not set an extra-day fee. Ask for extra time before the included rental period ends so we can confirm it in writing. Extra time remains subject to availability and the delivery schedule.

Why is the 10 yard lowboy priced separately?

The 10 yard lowboy is for reviewed clean heavy-material loads. Dense material can make a general-debris dumpster too heavy before it looks full. We check the exact material, moisture, separation, fill level, set-down spot, and disposal requirements; the written quote controls what is approved.

Do junk removal and cleanup use the same dumpster starting prices?

No. Those starting prices apply to self-loaded dumpsters. We quote loading-help junk removal, debris removal, and construction cleanup from the material, volume, items, labor, access, handling, schedule, and disposal requirements.

What should I send for an exact written quote?

Send the delivery address and ZIP, project type, every material, estimated volume and likely weight, preferred size or sizing question, delivery date, rental window, pickup deadline, placement and access photos, and any gate, slope, surface, overhead, street, permit, HOA, parking, tenant, or business-hour constraint.