Plan the dumpster around each ADU construction phase.

Keep excavation separate from other debris, compare starting prices, save City records when the rules cover your project, and check the set-down spot before delivery.

Clean dirt & concreteOther construction debrisSave C&D receiptsCheck the set-down spot
Get a Free Quote
Your address and job notes help us confirm delivery details

By submitting, you agree that Haul’n Off may contact you about your request. Estimates are non-binding, and submitting this form does not confirm service, pricing, availability, delivery, pickup, or permit status. Privacy Policy.

Or call (619) 720-4511 · email info@haulnoff.com

$560
15 yd total
$675
20 yd total
$771
Clean-material lowboy total
65%
City C&D diversion rule when covered

Direct answer

An ADU may need more than one dumpster.

Clean dirt and clean broken concrete may go only in the 10-yard lowboy. Do not mix them with other debris. Framing, drywall, cabinets, packaging, and other accepted construction debris go in a 15-, 20-, 30-, or 40-yard dumpster. Choose each dumpster for the work at hand, keep materials separate, and save C&D receipts when the City program applies.

Start here

Name the debris first. Then compare space, weight, included days, and the set-down spot.

Low-profile red dumpster containing a shallow load of clean broken concrete at a residential project
Keep dirt, concrete, asphalt, brick, stone, and tile separate from other debris. An approved clean heavy-material load may use the 10-yard lowboy.

Phase-by-phase ADU plan

Change the debris plan when the project changes.

A dumpster that works for digging may be wrong for interior work. Check the debris, weight, space, inspections, and pickup date again when the job changes.

Staked residential excavation footprint with a measuring tape and nearby soil pile
01

Site preparation

Measure the dig before choosing a dumpster for heavy material.

Keep dirt, concrete, asphalt, brick, stone, and tile separate from other construction debris. Tell us the exact material. An approved clean heavy-material load may use the lowboy after we check moisture, weight, access, and safe fill level.

Estimate dirt volume →
Red roll-off dumpster placed beside a residential construction project with staged material
02

Foundation & rough work

Move clean heavy material before framing debris piles up.

Foundation and hardscape work can create dense clean material, forms, packaging, and framing cutoffs. Keep the clean heavy material in a lowboy and the other debris in a general construction dumpster. Do not mix the two.

Plan construction debris →
Red roll-off dumpster loaded below the top rail with accepted residential remodel debris
03

Enclosure & interiors

Choose by volume, weight, and schedule—not the footprint alone.

Drywall, insulation, cabinets, doors, flooring, trim, and packaging can fill a lot of space. Compare a 20 or 30 yard dumpster, keep the load below the rim, and save C&D receipts when the project requires them.

Review the 20 yard →
Red roll-off dumpster beside staged lumber, drywall, tile, and packaging from residential construction
04

Finish & turnover

Right-size the last load instead of inheriting the rough-phase plan.

A short punch-list phase may fit a 15 or 20 yard dumpster. If you have bulky items or need help loading the final cleanup, compare a cleanup service instead of assuming you need another self-load dumpster.

Compare cleanup options →

2026 starting prices

Compare the debris, included weight and days, and starting price.

These are starting prices, not a guaranteed ADU total. The address, debris, set-down spot, street and truck access, availability, and written terms can all affect your quote.

General construction debris

15 Yard Dumpster

$560

Starting price

1 ton included

1 day included

Review size →

General construction debris

20 Yard Dumpster

$675

Starting price

2 tons included

1 day included

Review size →

General construction debris

30 Yard Dumpster

$900

Starting price

3 tons included

7 days included

Review size →

General construction debris

40 Yard Dumpster

$975

Starting price

3 tons included

7 days included

Review size →

Clean dirt & concrete

10 Yard Lowboy

$771

Starting price

Clean material only

5 days included

Review size →

$165/ton

Above included general-debris weight

Written quote

Confirms the details for your job

What can change the total

Price one ADU phase at a time.

Starting price + any general-debris overage + changes for debris, placement, access, timing, and other job details = your written ADU dumpster quote.

Empty red roll-off dumpster with a small staged set of bagged and boxed debris on a clear driveway

01

Starting price

Start with the dumpster price, included general-debris weight, and rental days shown for that size.

02

Debris type

Clean heavy material may go only in the 10-yard lowboy. Keep it out of the 15–40 yard dumpsters used for accepted general construction debris.

03

Weight & time

General-debris weight above the included amount is listed at $165 per ton. Requested extra time requires advance confirmation.

04

Placement & job details

The address, surface, public right-of-way, truck access, availability, special handling, and written terms all affect the quote.

Wood, wallboard, metal, and cardboard separated beside a red construction dumpster
Keeping materials separate helps prevent rejected loads and makes C&D receipts easier to track.

Two lanes, three decisions

Separate first. Size second. Schedule third.

Clean heavy material

Keep dirt, concrete, asphalt, brick, stone, and tile separate from other debris. An approved clean heavy-material load may use the 10-yard lowboy after we check the material, moisture, weight, access, and fill level.

Review the 10 yard lowboy →

Accepted general construction debris

Framing, drywall, cabinets, flooring, packaging, roofing, and other accepted non-hazardous C&D debris go in a 15-, 20-, 30-, or 40-yard dumpster. Included weight changes by size.

Review construction rental →

Prohibited materials

Hazardous materials, paint, liquids, chemicals, batteries, propane, tires, electronics, medical waste, and asbestos are prohibited in every dumpster. Appliances require approval before loading.

City of San Diego C&D records

Check whether the City requires recycling records for your ADU.

The City says most projects that need a building, combination, or demolition permit must divert C&D debris. Its current table lists a 1,000-square-foot minimum for new residential construction and also lists exemptions. Check your own permit before assuming the rule applies.

Where the dumpster can go

Check the set-down spot before you schedule delivery.

Private property is usually simpler than a public space. We still need to check the surface, slope, gates, turns, trees, wires, parked vehicles, and room around the work area. If the dumpster or construction work enters a street, alley, sidewalk, curb, parkway, or other public right-of-way, check the current City rules before scheduling.

See City right-of-way permit details ↗
Red roll-off dumpster beside staged lumber, drywall, tile, and packaging from residential construction
Empty red roll-off dumpster with a small staged set of bagged and boxed debris on a clear driveway

A clear request gets a clearer answer

Send the debris, set-down spot, access photos, and dates together.

What to send for a quote

Give us the details that can change the dumpster or price.

  • Delivery address, city, ZIP, and the agency that issued the permit
  • Current ADU phase and preferred delivery date
  • Every material planned for the load
  • Measured dirt volume or estimated general-debris volume
  • Likely weight and any dense material
  • Preferred size or a request for sizing help
  • Rental window, inspection dates, swaps, and pickup deadline
  • Photos of the set-down spot and the full access path
  • Notes about gates, slopes, surfaces, turns, trees, wires, streets, alleys, HOA rules, parking, neighbors, tenants, or work hours
  • C&D Waste Management Form or receipt-tracking requirements that affect the job
Request an ADU quote →

ADU dumpster FAQ

Questions to settle before the first delivery.

How much does an ADU dumpster rental cost in San Diego?+

Haul'n Off lists starting prices of $560 for a 15 yard general-debris dumpster, $675 for 20 yards, $900 for 30 yards, $975 for 40 yards, and $771 for the 10 yard lowboy for clean heavy material. General-debris weight above the included amount is $165 per ton. A separate 3% processing fee applies to all card payments. Appliances need approval before loading and cost $75 each. Extra time and any other terms must be confirmed in writing. Your ADU quote also depends on the address, phase, debris, size, weight, time, set-down spot, street and truck access, availability, and written terms.

What dumpster size is best for an ADU construction project?+

No single dumpster size works for every ADU. A small general-debris phase may fit a 15 yard dumpster. Framing and remodel debris often need a 20 or 30 yard dumpster. A 40 yard dumpster is for high-volume work when the debris and truck access allow it. Keep dirt, concrete, asphalt, brick, stone, and tile separate; an approved clean heavy-material load may use a 10 yard lowboy. Send the phase, debris list, estimated volume, likely weight, dates, and access photos so we can help choose a size.

Can dirt or concrete share a dumpster with framing and drywall?+

No. Keep dirt, concrete, asphalt, brick, stone, and tile separate from framing and drywall. An approved clean heavy-material load may use a 10 yard lowboy after we check the material, moisture, weight, fill level, access, and disposal requirements. Framing, drywall, cabinets, flooring, packaging, and other accepted non-hazardous construction debris go in the larger general-debris dumpsters.

Does every City of San Diego ADU require a C&D recycling deposit?+

Do not assume every ADU requires the deposit. The City says its C&D ordinance covers most permitted construction, demolition, and remodeling projects. Its application table lists a 1,000-square-foot minimum for new residential construction and also lists exemptions. Check the current permit and C&D application guidance for your project before the permit is issued.

What C&D records should an ADU project keep?+

For a covered City of San Diego project, save recycling, reuse, donation, and disposal receipts for every load. Also keep any photos or other records needed to show that material was separated or reused. The City says the completion package must be sent within 180 days after final inspection to request the deposit refund. The permit applicant must follow the current City instructions.

Does an ADU dumpster on the street require a permit?+

A dumpster or construction work in a street, alley, sidewalk, curb, parkway, or another public right-of-way may need City review, a right-of-way permit, and traffic control. Check the current City rules before scheduling. Private property is usually simpler, but we still need to check the surface, slope, gates, turns, overhead space, and truck access.

How many dumpsters or swaps will an ADU need?+

The number depends on the ADU design, digging, demolition, material sorting, dumpster size, included weight, work dates, inspections, available space, and where each load can go. An ADU may need a lowboy for clean heavy material plus one or more general-debris deliveries or swaps. We cannot give a fixed load count until we review the actual job details.

What should I send for an ADU dumpster quote?+

Send the full delivery address and ZIP, the permit agency, and the ADU phase. List every material, measured dirt volume or estimated general-debris volume, likely weight, preferred size or sizing question, delivery date, rental window, inspection dates, swaps, pickup deadline, and set-down and access photos. Also note any gate, slope, surface, wire, tree, turn, street, alley, HOA, parking, neighbor, tenant, work-hour, permit, or C&D record issue.

100% Free · No Obligation

Request Your ADU Dumpster Quote

Delivery timing depends on your address, requested date, dumpster, material, and our current schedule.

By submitting, you agree that Haul’n Off may contact you about your request. Estimates are non-binding, and submitting this form does not confirm service, pricing, availability, delivery, pickup, or permit status. Privacy Policy.

Or call (619) 720-4511 · email info@haulnoff.com